Event operations
On-site leadership, crew coordination, build management and problem-solving under live-event pressure.

Hands-on event operations, temporary structures, bespoke marquee linings and logistics support—backed by more than 25 years of experience across live events, exhibitions, conferences and elite motorsport.
Flexible support for event producers, structure companies, exhibition contractors and hospitality teams—whether you need one experienced lead or additional drivers and build crew.
On-site leadership, crew coordination, build management and problem-solving under live-event pressure.
Experienced installation and dismantling support for event and industrial structures, hospitality spaces and specialist builds.
View industrial structure build photos ↓Industrial warehouse structure build, shown in construction order.










Team leadership and site supervision for specialist sound reduction structure projects in the UAE and Saudi Arabia.
Explore sound reduction structuresDesign, manufacture and installation of one-off marquee interiors, drapes and specialist finishes.
View Ferrari 296 GTS grand revealView Lapland photosView Lona Restaurant photosView YEC Asda Tickled Pink photosInternational technical and logistics support in demanding Formula 1 hospitality environments.
View motorsport photosView McLaren Team Hub build photosBespoke marquee linings, drapes and interior finishes designed and fitted for events and venues.
Explore liningsHACShowman’s Show photosDesign and manufacture of one-off linings and tailored interior pieces for individual venues and event spaces.
Explore bespoke manufactureView lining manufacture photosFestive lighting and decoration support for events and venues.
Explore Christmas decorationsEvent graphics and printed materials to support venue branding and visitor information.
Available for event operations, technical builds, logistics support and international projects across the UK, Europe, the Middle East, Indonesia and beyond.
To me, event operations is everything that has to happen behind the scenes to make an event work properly. It can start with the first meeting with the client, understanding what they want and helping work out how the space should look and function. From there, it’s about planning what needs to be built, where it needs to go and when everything has to be ready.
A big part of the job is the logistics: working out what kit and materials are needed, getting them to site at the right time and making sure they’re loaded and unloaded safely. When the event is over, the kit has to be packed, checked and transported back. Good planning helps make sure the crew has what they need when they need it, and that nothing gets left behind or holds up the job.
My work also includes helping design and make drapes and linings. I have the sewing skills and can take a sewing machine to site, which means I can make or alter pieces there if a last-minute change comes up. It’s useful when something needs adjusting to fit the space or the client changes their mind during the build. I can help sort it out on site and keep the work moving.
All of this has to be done safely. I’ve grown up working to the UK’s strict health and safety standards, and I’ve seen first-hand how much they’ve changed since I started in the industry. I carry that experience with me on every job, making sure the work is properly planned and the crew works safely.
On site, I organise the work, support the crew and make sure everyone knows what needs doing. Plans can change, so it’s important to stay calm and keep the job moving through the build, the event itself and the breakdown afterwards.
I’ve learned that event operations is not just about getting the job done. It’s about taking responsibility, looking after the team, paying attention to the details and making sure everything is ready on time and meets the standard expected.
Sid provides team leadership and site supervision for sound reduction structure projects across the UK, UAE and Saudi Arabia.
From preparing projects in the warehouse and loading equipment through to on-site supervision and project management, Sid supports sound reduction structure projects from the UK to the UAE. In the UK, he works alongside -45DB UK. In the UAE and Saudi Arabia, he works alongside -45DB UAE, bringing experience as an On-Site Project Manager and Site Supervisor.
Two separate, climate-controlled structures, each measuring 7.2 m × 4.8 m, were installed for Abu Dhabi Sustainability Week (ADSW) 2026 at ADNEC in Abu Dhabi. Each had double doors, glazed panels, AV and audio connection points, and electrical sockets, ready for immediate use. During the live event, Studio 1 and Studio 2 were both used as filming studios. Hosted by Masdar, ADSW 2026 ran from 11–15 January.












George Bulluck and I teamed up to create this 8.4 m × 8.4 m climate-controlled, sound-reduction studio at The St. Regis Saadiyat Island Resort in Abu Dhabi. The live-broadcast setup gave Identity Middle East a quieter environment to work in while creating a real showpiece on the exhibition floor. The studio was fitted with AV and audio connection points, electrical sockets, single doors and glazed panels, ready for use. Delegates even stopped to take photos.





Intersec Dubai 2026 took place at Dubai World Trade Centre, bringing together more than 1,200 exhibitors from over 60 countries and welcoming more than 44,000 trade visitors from across the security, safety and fire protection industries.
Overseeing the build of this structure/studio on the concourse required careful planning and attention to detail to protect the venue. That care continued through every stage: load-in, build, derig and load-out.








The inaugural TOURISE Global Summit took place in Riyadh, Saudi Arabia, in November 2025, bringing together more than 5,000 delegates, CEOs and ministers to help shape the future of the global traveller economy. George Bulluck, Dan Wiltshire and I, alongside a large team, built 23 sound-reduction structures in just two days. Each structure was ready for branding and for furniture to be installed.










Design, manufacture and installation of marquee linings, drapes and interior finishes. Each project is tailored to the structure, venue and event.
Interior linings and finishes for temporary event structures.
Bespoke draping and interior treatments shaped around the space.
Experienced fitting and finishing on site, from preparation through handover.



The main structure at the Honourable Artillery Company in London measures 30 m × 100 m, with two side structures measuring 10 m × 100 m each. Together, they cover a footprint of 50 m × 100 m. The main structure is divided into a reception area and a main dining area, with a built-in sound-reduction stage area.
Over the 25 years I’ve worked on this job, I’ve seen many changes from year to year. Corporate companies use the venue for their Christmas parties. The two side structures house kitchens that cater for up to 2,000 people. The site also accommodates fairground rides, toilets, coat rooms, green rooms for the many special acts that perform there, and bars serving alcoholic and soft drinks.
Towards the end of the photos and video, you’ll see the team that leads the way in bringing this event together. Interior FX and I install the main bulk of the linings. Kendall Warnes, Jonathon Stewart and Kenny Styles build and install the gutter covers and baffle screens. The carpet team from Temporary Flooring Services Ltd is led by Leon Sphinx. Finally, the structure build is led by Michael Culcan and James Hickman.
This is one of my longest-running jobs, and I’ve seen many different companies involved in the build over the years. It’s definitely one of my favourite jobs. The size of it and the way it’s run are superb. I take my hat off to everyone involved, because without a team like the one in the picture, venues and parties like this would never happen.















One-off linings and interior pieces designed and manufactured for a particular venue or event. From the initial design through manufacture, finishing and installation, each piece is made to suit the project.
Bespoke solutions for unusual dimensions, structures and event requirements.
Specialist lining knowledge across design, manufacture, installation and final finish.







The Ferrari 296 GTS is the open-top version of Ferrari’s plug-in hybrid supercar, powered by a twin-turbo V6 and electric motor. Look closely and you can spot the yellow charging cable plugged into the driver’s-side rear quarter. We created a dramatic tunnel to frame the car for its grand reveal.
I worked on this installation with Ashley Mason and Max Welding, owners of Interior FX. We dressed the tunnel with RGB colour-changing starcloth and used standard black drapes to finish the showroom. Everything was installed using the pipe-and-drape method.







These photos show the build of Lapland London and Lapland Manchester. The project was run by Interior FX, with Reace and me brought in to help deliver these complex structures. After many hours of hard work from everyone, the finished results were amazing. We each felt proud as we walked away.






This new-build warehouse in Manchester was transformed for a party the owner held for his employees before factory work began. My close colleagues at Interior FX and I completed the installation and derig. The roof measured 20m x 50m, with an L-shaped extension creating a 30m-wide area for the toilets.
















This project transformed the interior of Lona Restaurant in Bristol. The fabric was hand-pleated on site, and I worked closely with Oasis Events and Kendall Warnes to deliver the finished space.


Here, Interior FX, AV Matrix and I each played our part in bringing the venue together and making it look as good as it did.










My McLaren story, from the Brand Centre and the first Formula 1 triple header to the Team Hub we see today.
I have loved McLaren for as long as I can remember. From the time I was old enough to understand what I was seeing as the cars raced around a circuit, McLaren stood out to me. Being able to work behind the scenes with the team has always meant far more than simply turning up for a job.
McLaren’s Brand Centre was unveiled in 2007. This impressive, multi-level mobile structure travelled around the European circuit with the team, providing a base for the drivers and team members, as well as a place for media activity, press conferences and sponsor meetings during the European races.
Not long after the Brand Centre was created, I had the opportunity to visit Maidenhead and see the structure for myself. I took measurements of the Level 2 ceiling so bespoke linings could be designed and made to fit. Knowing those linings are still working perfectly gives me a real sense of pride. My work became part of a place that has been closely connected to McLaren and Formula 1 for many years.
In 2018, I was involved in another important moment in Formula 1 history: its first-ever triple header. For three consecutive weekends, the championship travelled from France to Austria and then to Great Britain. At first, I knew the back-to-back races would be demanding, but I hadn’t realised the season would bring three races in three weeks.
The DHL article about the first triple header gives a glimpse of the scale of that challenge. Moving from Le Castellet to Spielberg and then Silverstone meant the whole travelling F1 operation had to keep moving, with very little time to pause between races. I experienced that challenge from the McLaren hospitality side. My role involved helping the team deliver its hospitality operation through those successive weekends, working with the crew to build, prepare and dismantle the facilities and get everything ready for the next race.
The tight schedule made every stage important. The work had to be carefully coordinated, and we had to maintain McLaren’s standards while following UK health and safety standards in every country we worked in. The hospitality spaces also had to be ready for the team, drivers, partners and media when they arrived. It was physically demanding and required focus from everyone, but being part of that effort made me want to take on the season even more.
For me, this was more than being involved in a demanding run of races. I was a lifelong McLaren fan, helping the team I had admired for years through a piece of Formula 1 history. That combination of personal passion, teamwork and responsibility made the first triple header a memorable experience—and it’s why my connection with McLaren F1 still means so much to me.
I’ve also included a link to Ted Kravitz explaining what was involved. It’s well worth watching to understand the scale of the challenge.
Sadly, by 2020 the Brand Centre had been decommissioned due to COVID-19 and financial reasons. When live sport resumed during the COVID-19 era, McLaren used a smaller unit to serve the same purpose: providing a base for the team.
In 2022, the Brand Centre was given a facelift and renamed the Team Hub. It’s hard to believe from the photos that it’s the same unit. I’m sure you’ll agree that the transformation is fantastic. The new Team Hub became the home of the McLaren F1 team until the end of the European leg of the 2025 season.
In 2026, a brand-new Team Hub was unveiled. The photos and video below show just how special it is and how it takes things to another level. Please follow the links to see more.



Follow the build from the base framework through module installation and interior fit-out to the exterior finish.
Read about the new McLaren Team Hub ↗















From marquee interiors and conferences to music events and global motorsport hospitality, Sid brings calm judgement, practical skill and accountability to every site.
Experienced in leading teams, coordinating trades and keeping builds safe, efficient and on schedule.
A rare combination of technical build expertise, manufacturing knowledge, HGV logistics and international site experience.
My working life in events began with Interior FX in 1998, just as the company was getting started. I wanted to travel and work in the live event industry, and that ambition shaped the path I took. I started in specialist marquee linings and also moved into tent building with De Boer Structures from 2007 to 2009. I then progressed into site supervision, event management and team leadership, while maintaining my long-standing connection with Interior FX.
I’ve spent more than 25 years working across events and temporary structures in the UK, Europe and the Middle East. My experience includes bespoke marquee interiors, major hospitality builds, sound reduction structures and semi-permanent buildings.
Since 2018, I’ve supported McLaren’s Formula 1 hospitality operations across Europe and led the team delivering the McLaren F1 Team Hub. My work also brings together event logistics and HGV driving, so I understand how planning, transport and hands-on work need to come together on site.
I like to stay involved in the work, not just oversee it. I’m comfortable organising a crew and keeping a build on track, while also getting stuck in alongside the team when the job needs it. I bring practical experience, a steady approach and real satisfaction in seeing a job come together properly.
SID360 is led by Sid and supported by a trusted network of experienced event professionals. The people in our circle bring many years of experience, while also bringing new talent into the industry and developing fresh ideas that are proven to work. When projects need extra hands, we can bring together truck drivers and build crews to suit the job.
From transport and site work through installation and handover, we work together to keep each project moving safely and smoothly.